GSP-NEW-01: Optimal Operation of a 40KW PV and 40 KW Battery and Storage System a the Yackandandah Water Treatment Plant in North East Victoria

Project title: Optimal Operation of a 40KW PV and 40 KW Battery and Storage System a the Yackandandah Water Treatment Plant  in North East Victoria

Project aim: To study the generation from the clean energy system and the consumption patterns of Yackandandah water treatment plant. To determine how to operate the system at lowest cost, the return on investment of the system. Whether the system could have been configured differently to save more money and projected future costs of on-site generation, will also be determined.

Industry partner: North East Water

North East Water (NEW) provides water and sewerage services to 41 localities across the North East Victoria and are one of 12 similar corporations throughout regional Victoria. North Easter Water operates as a retailer that on-sells water from our wholesaler, Goulburn Valley Water (GMW), which manages water storage, delivery and drainage systems involving 70% of Victoria’s stored water. North East Water serves an estimated population of 107,000 people in an area of approximately 20,000 square kilometres. This region extends from Corryong in the east, along the Murray River to Yarrawonga, and south to Benalla and the alpine towns of Bright, Mt. Beauty and Dartmouth.

NEW- Yackandandah dam image

Print Friendly, PDF & Email
Skip to toolbar